A global power generation and electrical manufacturing brand needed to fix a high-cost, underperforming distribution center. Legacy led the full transition to a new facility, handling site selection, buildout, staffing, WMS implementation, and go-live. The operation supported outbound shipments, drop ship orders, and returns processing. Engineering and operations teams streamlined workflows to improve cost and service across the board.
The result was a faster, more efficient, and more reliable distribution network.
The Results:
- 10x increase in order processing volume since 2011
- 3.64% average annual cost reduction per line
- Throughput increased from 3.96 to 4.48 in two years
- 25 FTEs redeployed through tech integration